Luftwaffe Resource Center - Main Page
Warbirds Resource Group Logo
A WARBIRDS RESOURCE
GROUP WEBSITE


DEPARTMENTS:

Custom Search

Follow WIXHQ on Twitter


Suggested Reading:

Junkers Ju 89

Design & Development

From the very beginnings of the Luftwaffe in 1933, General Walther Wever, the chief of staff, realised the importance that strategic bombing would play in any future conflict. A Langstrecken-Grossbomber ("long-range big bomber") was needed to fulfill this role.

Under the Ural bomber programme, he began secret talks with two of Nazi Germany's leading aircraft manufacturers - Dornier and Junkers - requesting designs for a long-range bomber. The two companies responded with the Dornier Do 19 and the Junkers Ju 89, respectively, and the Reichsluftfahrtministerium (RLM) ordered prototypes for both aircraft in 1935. The RLM request asked for two prototypes and a prototype series of nine aircraft.

The Ju 89 and its competitor, the Dornier Do 19, both proved promising, but fell victim to a change of direction within the Luftwaffe. Wever was killed in a plane crash in 1936. His successors - Albert Kesselring, Ernst Udet, and Hans Jeschonnek - favoured smaller, tactical aircraft, since they could be used to support army operations; they also did not require as much material and manpower. They were proponents of the dive bomber (Ju 87 Stuka) and the doctrine of close support and destruction of the opposing airforces on the battle-ground rather than through attacking enemy industry.

They convinced Hermann Göring by emphasising the need for tactical bombers to act in an army support role. While their beliefs seemed validated by Germany's early successes in the Blitzkrieg, the lack of strategic bombing capability severely hampered the Luftwaffe in the Battle of Britain and Operation Barbarossa.

First prototype

On 11 April 1937, the Ju 89 prototype D-AFIT (V1, c/n 4911) was first flown by Hesselbach. Just 2½ weeks after the first flight, on 29 April 1937, the further development of both strategic bombers was cancelled by the RLM. The reason for this step was the high fuel consumption of heavy bombers, as well as because a large number of bombers could only be manufactured if these bombers were medium bombers, like the Ju 88.

Junkers Ju 89 V-1
Junkers Ju 89 V-1.

Second prototype

Junkers completed the second Ju 89 prototype D-ALAT July 1937. Junkers used both prototypes for extensive flight tests to get experience of the stability and flight controls of large aircraft, but the third prototype V3 was stopped after the programme was cancelled.

On 4 June 1938, Junkers achieved a new payload/altitude world record with the second prototype D-ALAT with 5,000 kg (11,000 lb) payload at an altitude of 9,312 m (30,551 ft), (4,000 m (13,000 ft) more than a Short Stirling with the same payload). On 8 June 1938, D-ALAT reached an altitude of 7,242 m (23,760 ft) with 10,000 kg (22,000 lb). In late 1938, both aircraft were transferred to the Luftwaffe, where they were used as heavy transport aircraft.

Both Ju 89 prototypes seem to have been scrapped by the end of 1939, although some sources claim that they were still in use the following year in Norway. During testing, Luft Hansa expressed an interest in an airliner to be developed from the type, which led Junkers to rebuild the incomplete third prototype as the Ju 90.

Sources:
Gunston, Bill - The Encyclodepia of the Worlds Combat aircraft, 1976, Chartwell Books, Inc., New York
Brown, Eric, Captain - Wings of the Luftwaffe, 1979, Airlife Publishing Ltd., Shrewsbury
Gunston, Bill & Wood, Tony - Hitler's Luftwaffe, 1977, Salamander Books Ltd., London
Donald, David - The Complete Encyclopedia Of World Aircraft, 1997, Brown Packaging Books Ltd., London
Wikipedia - Junkers Ju 89

WOULD YOU LIKE
TO SUPPORT
THIS SITE?

(Click Here For Info)
Or

Follow this link to visit the Spirit of 44 website